Home / Communities / Damac Lagoons / Case study
52 defects in one Damac Lagoons handover
A four-bedroom townhouse, inspected before the owner signed. This is what was in the report — and which four items had to be fixed first.
In May 2026 we inspected a four-bedroom townhouse in Damac Lagoons on behalf of the buyer, before handover documents were signed. The inspection took most of a day. The report was with the owner that evening.
It contained 52 defects. Twenty-four were graded high priority, twenty-five medium, three low. Below is what that actually looked like, because a number on its own tells you very little.
Where the defects were
Defects were spread across every part of the property rather than concentrated in one bad room, which is typical of a unit finished under schedule pressure.
- Second bedroom — 9 items
- Kitchen — 7 items
- Main entrance — 6 items
- Master bedroom — 6 items
- Bathroom and master bathroom — 4 items each
- First bedroom — 4 items
- Balcony — 3 items
- Patio and outdoor parking — 2 items each
- Dining and living — 2 items
- Staircase, terrace and laundry — 1 item each
The four items that had to be fixed before signing
Most of the 52 were finish-quality issues. Four were not, and these are the ones that change whether you should accept handover.
Low water pressure throughout the entire unit
Not one tap — every water outlet in the property. That is an MEP issue rather than a fitting problem, which means it sits behind the walls and becomes expensive and disruptive to resolve once you have moved in and signed for the unit.
A humming, vibrating noise above the master bathroom
Nothing visible, which is precisely why it matters. A sound coming from a ceiling void points to mechanical plant or pipework that is not installed or supported correctly. There was no photograph to take. It went in the report anyway, and it is the sort of item a walkthrough never catches.
Multiple hollow floor tiles on the balcony
Hollow tiling sounds fine underfoot and looks perfect. It means the tile is not fully bedded, and on an external balcony exposed to Dubai heat cycling it cracks — usually within the first year, and usually after the developer's liability has become an argument rather than an obligation.
A non-functional outdoor power socket
Small in itself. Significant as a signal: an outlet that was installed, signed off and never tested. It raises the question of what else on that circuit was never energised.
The high-priority items behind those
Below the urgent four sat a set of items that were not emergencies but were not acceptable in a newly handed-over property either.
- Cooker hood and extractor fan performing well below expected flow rate
- Widespread colour variation in the wood flooring across bedrooms and hallway
- Entrance door peephole and handle loose
- Scuffs and chips on the main entrance door and frame
- Sliding patio door handle loose enough to affect closure
- Poor finishing at the wall-to-skirting junction in several rooms
- Gaps in sealant between tiles at the entrance and on the patio
And the ones that were only cosmetic
Paint, grout and sealant inconsistencies appeared in every room. Ceiling panels were misaligned in the bathroom and second bedroom. A wardrobe cabinet moved when used. The kitchen drain had an uneven gap and visible colour variation. A gas detector sat crooked.
None of these would stop you accepting the property. All of them are the developer's responsibility to correct, and none of them get corrected if nobody writes them down.
Why the grading matters more than the total
A list of 52 items with no priority attached invites a developer to work through it from the top and lose interest. Grading each defect by severity means the water pressure fault gets addressed first and the crooked gas detector last, which is the correct order for everyone involved.
Each item in the report carries a photograph, a location reference precise enough for a contractor to find it without a site meeting, and a grade. That is what makes a report actionable rather than merely thorough.
What the owner did next
The report went to the developer with rectification deadlines attached — nine days for most items, twenty for the larger ones. When the work was reported complete, we returned to verify it. That second visit is included in the inspection fee rather than charged again, because a defect list nobody checks against is not much use.
The downloadable version is this same report with the owner's details and the unit reference removed.
What we check on every inspection
Structure & finishes
Walls, ceilings, floors, skirting, paint, tile levels and hollow tiling.
Doors & joinery
Alignment, sealing, locks, handles, wardrobes and built-in cabinetry.
Plumbing
Water pressure, drainage, leaks, traps, heaters, bathroom and kitchen fittings.
Electrical
Sockets, switches, DB board, earthing, lighting circuits and outdoor points.
HVAC
Air flow, temperature differential, condensation, ducting and drainage lines.
Waterproofing
Bathrooms, roofs, terraces, balconies and external wall junctions.
External areas
Landscaping, irrigation, boundary walls, garage, driveway and drainage falls.
Thermal imaging
Hidden leaks, damp behind finishes, missing insulation and overheating electrical points a visual check cannot find.
Questions about this inspection
Is 52 defects a lot for a new townhouse?
It is a normal range for a new handover in Dubai. What matters is not the count but the split: on this unit, 24 items were high priority, including a water pressure fault affecting the whole property.
Would the buyer have spotted these on a developer walkthrough?
Some, but not the ones that mattered most. Low water pressure across the unit, hollow tiling under a finished balcony floor and a humming noise in a ceiling void are not things a walkthrough is designed to surface.
What happens to the defects after the report?
The report goes to the developer with each item photographed, located and graded. Once rectification is complete we return and verify it, which is included in the original fee.
Do all Damac Lagoons units have the same problems?
Not identically, but patterns repeat across a cluster because the same contractors finish many units to the same drawings. That is why community-specific inspection experience is useful.
Booking in Damac Lagoons
If your handover is coming up, see our Damac Lagoons snagging page for what we check in the community, or read how new handover snagging works more generally. If you moved in during the last twelve months, a defect liability period inspection is the better fit.
Handover date in Damac Lagoons?
Send us the unit type and your date and we will confirm availability and a fixed price the same day.