Inspecto Handover WhatsApp

Home  /  Sample report

See a real snagging report before you book

The clearest way to judge an inspection company is to read what they hand over at the end of it.

What is in the report

Every defect we record appears as a single entry containing four things: a photograph, a written description, a location reference precise enough for a contractor to find it, and a severity grade. Nothing else. No filler, no padding out the page count to look thorough.

The report opens with a summary of critical items so that anyone reading it — you, the developer, the contractor — can see within thirty seconds what has to be dealt with before handover and what can follow later.

Why we send it the same day

Handover paperwork in Dubai moves quickly. Developers schedule a date, hand over keys, and the documents get signed in the same week. A report that arrives 48 hours later frequently arrives after the signature, and once you have signed, responsibility for those defects has quietly shifted to you.

Sending it the same day is not a convenience feature. It is the difference between a report that gives you leverage and one that gives you a record.

What happens after you send it to the developer

The developer schedules rectification work. When they tell you it is complete, message us and we return to verify it — the de-snag visit, included in your original fee rather than billed again. We check each item on the original list and confirm what was genuinely fixed against what was signed off as fixed. Those are not always the same list.

Questions about the report

What format does the report come in?

A PDF you can forward to your developer without editing it. Every defect carries a photograph, a location reference and a severity grade.

How quickly do I get it?

The same day as the inspection. Most Dubai companies quote 24 to 48 hours; a report that arrives after you have signed the handover is worth considerably less.

Can the developer work from it directly?

Yes. That is what the location references and grading are for. Contractors can find and prioritise each item without a site meeting.

Ask for a sample and judge it yourself.

Send us a message and we will forward a real report with the client details removed.

Message us